详解双组份打胶机设计三种方法

时间:2020-10-21 来源:http://www.jncsjx.com/ 发布人:昌盛机械

双组份打胶机设计三种办法:
There are three ways to design a two-component gluing machine
(一)双组份打胶机机械体系规划办法
(1) Planning method for mechanical system of two-component gluing machine
机械体系规划足研究组成体系的各部分及其内在联系,从全体体系动身,建基本规划准则,辩证设汁问题的一种规划分法。体系规划办法的主要思维是在规划过程中强调体系内部和外部环境的联系,强调全体体系和分体系的联系,并以之贯穿干整个规划过程。在分解与综合中要考虑各分体系联络联系的强弱及其与全体体系相关的完整性。
Mechanical system planning is a kind of planning method which studies the components of the system and their internal relations, starts from the whole system, establishes the basic planning criteria, and dialectically solves the design problem. The main thinking of the system planning method is to emphasize the relationship between the internal and external environment of the system, the relationship between the whole system and the sub-system, and run through the whole planning process. In the process of decomposition and synthesis, the strength of each subsystem's connection and the integrity related to the whole system should be considered.

 

双组份打胶机
(二)双组份打胶机优化规划办法
(2) Optimization planning method of two component glue applicator
优化规划办法是应用数学优化原理实际问题的规划办法。针对规划使命,以结构合理,工作性能佳,成本低等为规划要求,在多种方案、多组参数、多种规划变量巾确认主要规划变量的取值,使之满足优规划要求。在机械规划中,优化规划体现为传规划方案的确认和佳规划参数的确认。
The method of optimal planning is to solve practical problems by applying the principle of mathematical optimization. In view of the planning mission, taking the most reasonable structure, the best performance and the lowest cost as the planning requirements, the values of the main planning variables are confirmed in a variety of schemes, groups of parameters, and various planning variables, so as to meet the optimal planning requirements. In the mechanical planning, the optimal planning is embodied in the confirmation of the best planning scheme and the best planning parameters.
进行双组份打胶机优化规划时,首要需要对具体的工程问题进行比较深化的了解,挑选优化核算办法,构造合适的数学模型,寻觅优规划成果,找出佳规划参数。如减速器规划中,能够将资料省和结构紧凑作为规划方针。这样,在传动装置规划核算中.应该注意合理挑选热处理工,参数挑选时尽量使各部分的强度量合理。运用优化规划办法,能够加快规划过程、缩短规划周期,达到事半功倍的意图。
In the optimization planning of two-component gluing machine, it is necessary to have a deeper understanding of the specific engineering problems, select the optimal accounting method, construct the appropriate mathematical model, search for the optimal planning results and find out the optimal planning parameters. For example, in the reducer planning, the most economical data and the most compact structure can be taken as the planning guideline. In this way, in the planning and calculation of transmission device, attention should be paid to the reasonable selection of heat treatment workers, and the strength of each part should be reasonable when selecting parameters. Using the optimization planning method can speed up the planning process, shorten the planning cycle, and achieve the purpose of twice the result with half the effort.
(三)双组份打胶机牢靠性规划
(3) Reliability planning of two component gluing machine
牢靠性是指体系在规则时刻内,在给定条件下完结规则功能的能力。产品的牢靠性需有一个定量的表述,但牢靠性的定量表述具有随机件,对任何产品来讲,在其牢靠工作与失效之间,都具有时刻上的不确认性;因而,关于不同类型的牢靠性问题,就需要不同的表述方式,常见的有牢靠度、无故障率、失效率、平均无故障时刻等。合理规划分配各部分的牢靠性指标,能够大限度地发挥各部分的规划优势,保证产品在工作品质、技术标准和运用等文面达到高高质。
Reliability refers to the ability of the system to complete the rule function under the given conditions within the rule time. The reliability of a product needs a quantitative expression, but the quantitative expression of reliability has random parts. For any product, there is uncertainty at any time between its reliable work and failure. Therefore, different types of reliability problems need different expressions, such as reliability, failure free rate, failure rate, average time between failures, etc. Reasonable planning and distribution of the reliable indicators of each part can maximize the planning advantages of each part, and ensure that the products reach high quality in terms of work quality, technical standards and safe use.

联系我们Contact us

  • 咨询热线:0531-85717458 13705446998
  • 公司地址: 山东省德州市齐河安头乡企巢工业园
  • 扫码联系我们:

截屏,微信识别二维码

微信号:13705446998

//